South Mountain Freeway ITS Lead/ITS Design
South Mountain Freeway ITS Lead/ITS Design
YSMA served as the ITS Lead representing the Design Build Team of Connect202 Partners for this 22 mile freeway project, which was the largest design-build project in the Southwestern US.
Our agile project management style was leveraged to meet the challenges on multiple fronts such as integrating the legacy ITS system along I-10 with the new system; creating a construction sequencing plan that would adhere to ADOT’s strict downtime requirements; providing interdisciplinary review inputs to optimize the design from functionality, construction, and cost standpoints. In addition, we designed ITS elements along 11 miles of the project Corridor consisting of 11 DMS Signs, 17 CCTV Cameras, 28 Ramp Meters/Detection Stations, 43 Wrong Way Detection Cameras, Node Building and End Equipment, 55 splice points, 22 miles of fiber optic layout, and Electrical Conductors, etc. |
|